Thursday, 25 August 2011

Scraping Sky

It's been two weeks again, and it seems like all I've been writing about is this Regina Street project.

(I swear we have more on the go than this one. Although, we are pretty excited to get this one going)

I've create another panaromic image of the site, I may even include a google street view of what the site looked like before the demo started. Until then, you can have a gander at this one. Try to point out all the differences you see. My favourite is the yellow tower, that's when I know things are underway.

We're still set for an end of September, and there will be more pictures to share before then. You can follow the progress at our flickr page, as well as on twitter. The contact info for the twitter account is in the margin next to this post.

The project is a 18,000 sq ft, 17 storey student residence and will be ready for September 2012 occupency. There are nearly 500 rooms in apartment style living. There will be shared living area, but each bed with have its own bath.

We have had a few lengthy meetings about some adjustments to the window details. We have to design a way to have concrete flow to the outside of wall so as to break the connection between ICF, meeting a new fire regulation. We have a solution, because as we've said before, anything can be done with our ICF. When we have the design finialized I'll share it with you, until then I'll leave you in suspense.

Enjoy this image and I'll talk to you again soon.

Cheers,

Brad

(again, the image isn't the greatest here but a simple click will get you to a better version. If anyone has some tips to make my flickr account get along better with my blogger account please, by all means, share them)


Thursday, 11 August 2011

Sky's The Limit, week 2

It's two (and a bit) weeks later and I have another photo to share. The job site in Waterloo is slowly taking shape; changing from a hole in the ground to an organized footing site.

I compliled another stitched panoramic shot, this time Darrel posed for it while he surveyed the changed site.

We're set now to start at the end of September, but there will be more pictures to share before then. You can follow the progress at our flickr page as well.

The project is a 18,000 sq ft, 17 storey student residence and will be ready for September 2012 occupency. There are nearly 500 rooms in apartment style living. There will be shared living area, but each bed with have its own bath.

Again, we are very excited to get started on this project and I look forward to sharing the experience with you.

All the best, and happy thursday!


(Clicking on the image will get a better version for you to see)

Wednesday, 3 August 2011

Wasteless Wednesday

DSC_0957In the spirit of my discovering the hashtag #WastelessWed, not to mention the twitter handle @WastlessWed, I wanted to share something that we've done in the past with some of our left over material.

The block we work with needs to be shaped to fit the projects we work with. Since a wall is never easily divisible by 4 feet, nor is the height divisible by 16 3/4", we have to cut away the parts that don't need to be in the wall. It can result in quite a bit of waste, waste that we don't like because for 1), we've already paid for it and 2) it ends up in a landfill, not contributing productively to society ... unlike the energy efficient buildings we so proudly erect.

DSC_0949So, we started bagging it up. And bagging and bagging and bagging. It took up a lot of space, but we wanted to do something with it ... we just hadn't figured it out.

Then we did.

While touring around at a homeshow in Toronto a couple of years ago we found a company who made beanbag chairs. As it turns out it wasn't going to work to supply them with pellets to stuff their chairs, but we could start making our own. A lot of time and a few trials later we had a couple of prototypes to play with.

We rented a bail grinder and started separating the leftover block from the plastic webs (which are completely recycable when not part of the block). The beads that came out the machine the first time around weren't quite small enough, and thus took a couple of trys. Once we were happy, we created a funnel to get the beads into our bag shell and voila: Recylced BeanBag Chair.

They aren't designer by any means, but they are homemade with tons of love. Now we have a few chairs to give away at homeshows that we attend, or to families who's houses we build.

The chairs are colourful, comfy and a friend re-use of otherwise useless material.

Sunday, 31 July 2011

Sky's the limit

... but you have to start somewhere.

Here's where we're starting in Waterloo. Eventually it will be a student residence 17 storeys high, for now it's simply a hole in the ground. We expect to be setting block come October, but until then here's a panoramic shot of the footings being dug for the building.

Regina Street July 22


The job site is being run by Melloul-Blamey and we're excited to be working with them on this project.

Friday, 29 July 2011

Getting Your Footing Right

Footings, Basement Full Height by CroninICF
We are now three weeks into our project in Sudbury, ONT. The guys have been working hard to get the building set on the right path and getting themselves up and out of the mud. We are putting up a three story, 90 unit seniors residence. There are a lot of ICF walls going up; a couple of thousand linear feet. With all these ICF walls going up, it is so very important for our footings to be level before we begin to set our block.

Well constructed footings are important regardless of the type of wall you build and are absolutely essential for ICF construction.


ICF contractors know that a quality footing will save them headaches later on, and are willing to put the time in to make them as perfect as possible. We like to pour our own footings, because we know that the extra attention will be worth it when we set the wall.


Any deviance in the footing from straight, level or plum will cause significant problems later.

 

If the footing isn't absolutely level, the wall will be out of plumb. Absolutely. An out of plumb wall is no good as a wall.

If the footing dips in the middle than at the corners, when the ICF blocks are set they will be tight as they go up. They'll bind and twist and make getting the wall straight difficult, and could increase the chance of a blow out during a pour. Contrariwise, ff the footing humps, the corners will be pushed out of plumb.

Out of square layouts are just as bad. We have cursed an inaccurate footing with out-of-place rebar. We make absolute certain that our vertical bars come out of the concrete straight, and are on the surveyed centre of wall line.


It doesn't have to be difficult, and it's possible to easily pour accurate, level footings every time.


Here's a link to some more images of the footings. We expect to be done the footings and on to walls before the end of this week. The linked photo-set will be updated as the building goes up and we have more to brag about.


Which we will, cause we're pretty proud of our work.


Cheers, and happy Friday!

Thursday, 14 July 2011

Make your house Green!

Building your home using ICF products is a green choice for you, your family and the environment.

You and your family get the benefit of improved indoor air quality, less exposure to outdoor pollutants and allergens, and no volatile organic compounds. ICF walls and foundations are also mold- and mildew-resistant, decreasing risk from those irritants.

As well, your home will use less energy, reducing your carbon footprint – less fuel will be used to heat and cool it, reducing greenhouse gas emissions.

Your green choice will have an additional positive impact on your wallet. Your ICF energy-efficient home may be able to be LEED-certified, or receive a higher ‘HERS’ score or EnerGuide rating – and either of these (along with your lower utility bills) will improve your home’s resale value.

Monday, 11 July 2011

Joplin, MO

After the storms hit Joplin, MO, a co-worker and I went to survey the damage, and to speak with local builders, architects and concrete suppliers to see what could be done for the community when they rebuild.

As seen in the attached news report, it seems that at least one local builder has taken steps to ensure his family is safe if a tornado like the one that Joplin in May.

To read more about how an ICF house can keep you safe visit this link.

As well, here is a link to the photos we took while in MO.



To be even more safe, I would suggest constructing your basement foundation, even the entire house (right to the rafters) out of ICF block. Not only will your family be safe, but your house will remain intact after a powerful storm passes through.

Houses constructed out of ICF have remained after storms went through New Orleans, and other major storm centres.

Read More

Friday, 8 July 2011

Looking for Hard Workers










Job Title: General Employment: CRONIN CONTRACTING INC. Specializing ...
Date Posted: 7/8/2011
Closing: 7/21/2011
City: Sudbury
Source: The Sudbury Star




CRONIN CONTRACTING INC. Specializing in ICF Construction. We are currently accepting applications for construction labourers to work in the city of Sudbury. Applicants must be hard working, able to work outdoors and have a valid drivers license. Construction experience an asset. Please fax resumes to (519)345-0201

Thursday, 7 July 2011

Google and ARXX

 Twitter was humming the other day when Arxx made this announcement. I use google applications for just about everything I do (Docs, gmail, blogging) and now, thanks to innovations at both offices, we can use Sketch-up to add ICF to your drawings.

 Below is the news release from the ARXX website.


June, 2011
Cobourg, ON, June 16, 2011 – ARXX Corporation announced that it has completed the process to have all of its products available in Google SketchUp 3D becoming the first Insulating Concrete Form (ICF) company to have this tool. Google SketchUp is a user-friendly 3D modeling program incorporating an intelligent drawing system and product models. Google SketchUp is showing rapid growth and adoption within the design professional community as well as by contractors, builders and homeowners. Using Google SketchUp can incorporate ARXX ICF products into buildings instantly, making the design process easier and faster than ever.
“We take leadership and innovation seriously,” said Gael Mourant, President & CEO of ARXX. “Being a leader requires taking the steps to continually evolve products and services. We want to ensure that designing and building with our products is as easy and accessible as possible. We recognize the role that technology is playing in facilitating how people design buildings. Google SketchUp is another complementary tool being added to our existing technical resource base. At ARXX we’re dedicated to providing the best customer and technical support in the industry,” she added.
Access to the ARXX Google SketchUp product models can made through the Technical Resources section of www.arxx.com. The addition of SketchUp complements the existing Building Information Modeling (BIM) files and CAD product and design library.
About ARXX
ARXX is a leading supplier of Insulating Concrete Forms (ICFs) for green, energy-efficient residential and commercial construction. ARXX products have been used in over 105,000 projects, representing 140 million square feet of walls and foundations, throughout the United States and Canada. ARXX products enable significant energy savings, greater comfort, security and quiet, and a faster build than conventional construction. ARXX products have been used in numerous LEED-certified projects have received major industry and sustainability awards. See www.arxx.com for more information.
Happy Thursday!

Thursday, 23 June 2011

Forest Baptist Church

Forest Baptist Church Addition

We completed the Forest Baptist Church addition in September of 2010. The building is equipped with state of the art audio/visual, and has seating for 500 people. The 10,000 Square Ft. addition was constructed with 100% with ARXX® ICFs. The ICF frost wall and main walls were completed in 3 weeks.


Pictures of the finished building will be posted soon. Until then, click on the photo below to see some more that we have of the building process.





BUSH0040






 

PROJECT TYPE
Forest Baptist Church Addition

PROJECT SPECS
10,000 Square Ft. Addition
100% of Exterior Walls of Addition built with ARXX® ICFs


PROJECT DETAILS

Tall Walls 26' high - one pour for all tall walls

TIMELINE
ICF Frost Walls and Main Walls completed in 3 weeks

DISTRIBUTOR

Castle Block Distributing
Dublin, ON

Thursday, 16 June 2011

Stratford Chiropractic and Wellness Centre

Stratford Chiropractic and Wellness Centre

PROJECT DETAILS
When erecting the main floor walls with ARXX ICF, the front foyer (which is open to the second floor) was built using the tall wall system, and was poured in one continuous pour.

Insul-Deck floor system was used on the main floor, which eliminates the transfer of sound from the main floor to the offices in the basement. The Insul-Deck floor also benefits when using radiant floor heat as it insulates and reduces loss of heat.

Building incorporates environmentally friendly construction and other energy saving features.

By installing a Geothermal heating and cooling system it will decrease energy use by 40%.

The design of the building with numerous large windows will allow for natural lighting.



"Using the ARXX ICF form for this project was very efficient and environmentally conscious as this was an important detail to the client. The design of this building made the wate factor for the ARXX material minimal."
Stratford Chiropractic and Wellness Centre



PROJECT TYPE
Commercial Office Building

PROJECT SPECS
6600 Sq. ft. 100% of Exterior Walls built with
ARXX® ICFs

TIME LINE
Project Started - November 2007
Project Completed - June 2008

DISTRIBUTOR
Castle Block Distributing
Dublin, ON

ENGINEER
R.J. Burnside and Associates Limited

Sunday, 5 June 2011

Dublin Office

Cronin Contracting, Shop in Dublin

PROJECT DETAILS

We broke ground at the site for our new shop in June, 2010. We knew we would miss the old barn, however we were all very excited for what was going to replace it. The shop was completed this past November, and we're happily moved in ... mostly.

There are always a few boxes that never seem to get unpacked.

All exterior walls are built using ARXX ICF block and HELIX steel fiber. Walls measure 23 feet and were poured off in one shot with no floor separation. 5,900 square feet of shop space and 3000 square feet of office area. Radient floor heating, triple glaze windows and a giant lift for our equiptment.

We're really excited to be moved in and we can't wait to share it with you.


shop w truck
DSC_0040DSC_0055


PROJECT TYPE
Commercial Office Building and Shop

PROJECT SPECS

5,900 Sq. ft. shop floor, 3,000 Sq ft. office space. 100% of Exterior Walls built with
ARXX® ICFs

TIMELINE
Project Started - June 2010
Project Completed - November 2010

DISTRIBUTOR

Castle Block Distributing
Dublin, ON


MASONRY

Avery Natural Stone

Wednesday, 1 June 2011

Mady House

Mady Residence

PROJECT DETAILS
The footprint plan of this home was very complex. It has a variety of unique types of walls including radiuses, octagonal shaped rooms and non-standard angles.

The 2500 sq ft. garage was also built out of ARXX ICF. It was a climate-controlled garage for antique cars.

The front entrance and rear walls of the home are 22 ft. high with no support floor between them.

There is a spiral staircase with bridge connecting both sides of the second floor which over-looked the open area of the front entrance and great room.



PROJECT TYPE
Large Residential, Custom Home,
Single Family Residence

PROJECT SPECS

13,000 Sq. ft. with 100% of exterior walls built with ARXX ICF

TIMELINE
1 Year Project

AWARDS

2007 ICF Builder Awards,
1st Runner Up.
Large Residential Category


DISTRIBUTOR

Castle Block Distributing
Dublin, ON

ARCHITECTS

Joseph Toth Architecture,
Windsor, Ontario

Thursday, 26 May 2011

Welcome,

Hello, and welcome to the Cronin Contracting blog. We are an Insulating Concrete Form (ICF) installer and distributor operating out of Dublin, Ontario. On this blog we'll share stories from the job site, share buildings that we've built in the past as well as share ideas for how you can include the ICF product in your next building project.

20 years ago Darrel Cronin started building residential houses out of ICF near his home base of Dublin. Since then the company has been involved in many unique projects all over Ontario, as well as the United State, expanding to include many Commercial and Institutional projects.

Please feel free to contact us here on this blog, browse our pictures or follow us twitter. Further contact information can be found on our main website.

Cheers,

Brad