Stratford Chiropractic and Wellness Centre
PROJECT DETAILS
When erecting the main floor walls with ARXX ICF, the front foyer (which is open to the second floor) was built using the tall wall system, and was poured in one continuous pour.
Insul-Deck floor system was used on the main floor, which eliminates the transfer of sound from the main floor to the offices in the basement. The Insul-Deck floor also benefits when using radiant floor heat as it insulates and reduces loss of heat.
Building incorporates environmentally friendly construction and other energy saving features.
By installing a Geothermal heating and cooling system it will decrease energy use by 40%.
The design of the building with numerous large windows will allow for natural lighting.
"Using the ARXX ICF form for this project was very efficient and environmentally conscious as this was an important detail to the client. The design of this building made the wate factor for the ARXX material minimal."
Stratford Chiropractic and Wellness Centre
PROJECT TYPE
PROJECT DETAILS
When erecting the main floor walls with ARXX ICF, the front foyer (which is open to the second floor) was built using the tall wall system, and was poured in one continuous pour.
Insul-Deck floor system was used on the main floor, which eliminates the transfer of sound from the main floor to the offices in the basement. The Insul-Deck floor also benefits when using radiant floor heat as it insulates and reduces loss of heat.
Building incorporates environmentally friendly construction and other energy saving features.
By installing a Geothermal heating and cooling system it will decrease energy use by 40%.
The design of the building with numerous large windows will allow for natural lighting.
"Using the ARXX ICF form for this project was very efficient and environmentally conscious as this was an important detail to the client. The design of this building made the wate factor for the ARXX material minimal."
Stratford Chiropractic and Wellness Centre
PROJECT TYPE
Commercial Office Building
PROJECT SPECS
PROJECT SPECS
6600 Sq. ft. 100% of Exterior Walls built with
ARXX® ICFs
TIME LINE
ARXX® ICFs
TIME LINE
Project Started - November 2007
Project Completed - June 2008
DISTRIBUTOR
Project Completed - June 2008
DISTRIBUTOR
Castle Block Distributing
Dublin, ON
ENGINEER
Dublin, ON
ENGINEER
R.J. Burnside and Associates Limited